Back to Repair Logs
COMMERCIAL HVAC & VENTILATION REPAIR
High-Level Commercial Air Handling Installation
Hampshire
Date: 11/20/2025
Fault Diagnosis & Resolution
A comprehensive installation of a high-capacity ducted fan coil unit within a large-scale commercial facility. This project involved custom structural mounting at height and precision routing of insulated refrigerant lines and drainage. The system utilizes multi-nozzle air distribution to ensure even temperature coverage across expansive floor areas.
Actions Taken
Custom structural mounting
Precision routing
Multi-nozzle air distribution
Facing a Similar Breakdown?
Our engineers have solved this specific issue before. Book a diagnostic visit today.
Book Diagnostic